
What Does the FORTEC US Operations Team Do?
November 17, 2026
By Talisa Westford, Marketing Executive, FORTEC US
The FORTEC US operations team plans production, buys the parts, tracks every order until it ships, and handles returns. It is the link between sales and the production floor at our facility in Ronkonkoma, New York.
Who Is on the FORTEC US Operations Team?
George Webster, our Director of Operations, leads the FORTEC US operations team. He oversees all of operations, with a focus on risk management. He works with Nakia LeBron, Kieran Kenney, and Michael Frank, and bigger issues go to him. The team:
- George Webster, Director of Operations: at FORTEC since 2019.
- Nakia LeBron, Production Planner: more than 16 years at FORTEC.
- Kieran Kenney, Purchasing: 16 years at FORTEC.
- Michael Frank, Purchasing: about seven years at FORTEC.
For the steps an order takes through our facility, see how an order moves through FORTEC US. For who leads FORTEC US, see New Leadership for FORTEC US.
How Does the Operations Team Keep an Order on Schedule?
The FORTEC US production planner schedules each order through production and keeps it on its due dates. Nakia works with purchasing, sales, and the production floor, reviews the reports, and meets with production on what can be expedited. She then issues the paperwork to the warehouse and the floor with due dates, so jobs can be pulled into production. As production clears each job, she creates the shipping paperwork so the warehouse can get it out of the building.
“Responsible for making sure parts get in and out of our building in a timely fashion and stay on schedule and keep our sales team informed and updated on their production and regular orders.”
Nakia LeBron, Production Planner, FORTEC US
Parts are often built ahead of schedule and held in our warehouse, depending on vendors and shipping. Building ahead gives the warehouse more time to pack an order and get it out.
How Does FORTEC US Buy the Parts for an Order?
FORTEC US purchasing buys the parts for each order as the production schedule needs them. Michael explains:
“We do a lot of ‘just-in-time buying’ and we need it; it’s driven by the schedule.”
Michael Frank, Purchasing, FORTEC US
That is why shipments from Europe come in twice a month, rather than being consolidated into fewer deliveries to save on freight.
When everything is in order, an order is typically in purchasing’s hands for only a couple of hours. That is when the order uses a usual vendor and the parts are on the shelf. With a new vendor, purchasing first checks that it is legitimate and credible.
Purchasing vets every part number for accuracy. A small difference can mean the wrong part. In Michael’s words:
“There are many nuances to the part number that can change the item completely, which would make it unusable for us.”
Michael Frank, Purchasing, FORTEC US
To catch those differences, Michael checks part numbers against online component resources.
Purchasing scrutinizes every order for anything missed or anything that doesn’t make sense, rather than ordering it line by line. On one order, for example, a custom spacer turned out to be available already customized, off the shelf, for far less. That is the risk management George oversees: making sure the right part is purchased at the right time for the right customer. In his words:
“I love making things go right, and my influence is making sure they do.”
George Webster, Director of Operations, FORTEC US
When sales needs a special part, a shorter lead time, or a better price, purchasing can source outside our usual vendors. Those parts go into the assemblies we design and build in Ronkonkoma, which is the difference explained in Is FORTEC US a Distributor?
What Happens When a Part Is Late?
When a part is late, FORTEC US works with the vendor on a better delivery date and tells sales why, and how much extra time is needed. The most common causes are vendor and shipping delays, and tariffs, which Navigating Tariffs covers in more detail.
To catch a delay early, we watch each delivery against its lead time from the moment purchasing places the order. Where we can, we ask vendors to ship in advance, because a part can leave a vendor on time and still be held up in customs. The sooner it ships, the more time there is to deal with that. A weekly meeting reviews open, late, and problem orders.
A vendor’s date can change more than once, later or sometimes earlier. Each change comes from the vendor to purchasing, goes through our production planner to sales, and from sales to the customer.
Components in this industry have a short life. End-of-life parts “come fast and furious,” says Kieran. If a part is no longer available, purchasing works with engineering, led by Kyle Rickey, to find a replacement. How FORTEC US Helps Companies Navigate End-of-Life Components explains how we plan for it.
How Does the Operations Team Keep Sales Informed?
The operations team keeps FORTEC US sales updated on each order’s production and on any delay. When sales asks for tracking details and they are available, we pass them on. Nakia sits at the center of that, as Kieran puts it:
“She’s the gatekeeper between operations and sales.”
Kieran Kenney, Purchasing, FORTEC US
Where Can FORTEC US Ship an Order?
FORTEC US can ship an order to our facility in Ronkonkoma, direct to the customer, or to a third party when the order needs work beyond what we build. Purchasing verifies the shipping address on each order. It reads the whole order, not only the line items. Sometimes only a note says where an order goes: direct to a customer in Canada, for example, rather than to us in New York. Before it ships, we check that it is on time and ready to go, confirm the package weight and size, and pick the most cost-effective shipping method.
How Does FORTEC US Handle Returns (RMAs)?
At FORTEC US, Michael Frank in purchasing handles returns (RMAs), whether the specs are wrong or the product is defective. We assess each return to see whether it can be repaired here or elsewhere. To start a return, fill out our RMA form, which explains what to include and where to send it.
Returns also run the other way: when a part we bought turns out to be defective, Michael raises an RMA with the vendor. When a part we purchased causes an issue in production, he writes a non-conformance report (NCR) and goes back to the vendor with it. For how we check parts on the way in and on the way out, see what quality control checks at FORTEC US.
FORTEC US Operations Team FAQs
Can FORTEC US drop ship an order?
Yes, we can ship an order to one place first and drop ship it to the customer from there. We verify the address before it goes.
What if a part goes end of life?
We plan around it with you before supply runs out. That means a last-time buy to cover the remaining builds, or qualifying a replacement with our engineering team.
Does operations work with the FORTEC Group?
Yes, and there is more support between the FORTEC Group companies than there used to be. We bring in a sister company when a customer is in its area or in both of ours, or when it knows the specs better. Either way, we deliver the work as one project. As George sees it:
“I like the facets of a small company, with the reach of being part of a larger company.”
George Webster, Director of Operations, FORTEC US
See What Does the FORTEC Group Mean for US Customers? or the FORTEC Group locations.
Start a Project with FORTEC US
Send us the drawing or specification, the quantities, and when and where the order needs to arrive. We plan the production, source the parts, track the order through our facility, and keep you updated through our sales team until it ships. Email info@fortec.us or contact FORTEC US to start.

DDP520 Power Supply: 340 W Without a Fan in a 3 x 5-Inch Footprint
November 16, 2026

Which PCAP Touchscreen Construction Fits Your Design: Glass/Glass, Glass/Film, or Film/Film?
November 4, 2026

Which Industries Does FORTEC US Serve?
November 3, 2026

Bringing AI to the Point of Care: Does Your Next Medical Device Need an NPU?
November 2, 2026

What Does the FORTEC Group Mean for US Customers?
October 30, 2026

Is FORTEC US a Distributor? What a Value-Added Display Supplier Does
October 29, 2026


